In the environment we have a Primary Server which has the DP role installed. It's a virtual Server running on VMWare. When we get more then 5 systems to start the PXE process only 5 go to completion the remainder crash. If we stager them about 5 minutes apart and start 5 at a time the do go to completion but it take way too long. In the old environment System Center 2007 we were able to image 40 computers at the same time without issue. Why is System Center 2012 R2 CU3 limited to 5 systems at a time? What are we doing wrong or what do we have configured wrong?
Any help would be grateful.
Joe